Pfister F-049-VTYY Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 14
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
ENGLISH
ENGLISH
8
9
7
7 HANDLE INSTALLATION
Thread Valve Adapters (7A) onto the Valve End Bodies (7B) and tighten so that the
Valve Adapters (7A) sit on the surface of the Valve Body Washers (7C).
Place Plastic
Seal Rings (7D) against the bottom of Handle Hubs (7E). Connect Handles (7F) onto
Valve Adapters (7A).
Be sure Valves and Levers are in the “OFF” position. Secure handles by holding the Lever
(7G) in place and tighten Handle Hubs (7E) by rotating them in a clockwise direction. To
remove handles, rotate Handle Hubs (7E) in a counterclockwise direction.
8 SPOUT ATTACHMENT
Insert Lift Rod (8A) into hole at the back of Spout (8B). With Spout (8C) facing forward,
carefully install the Lift Rod (8A) and Shank (8D) through the center hole of sink (8E).
9 SECURING SPOUT BODY
From underneath sink, secure Spout Body (9A) by placing Metal Washer (9B) and
threading Mounting Nut (9C) onto Spout Shank (9D). Make sure that the bumps on
Metal Washer (9B) are facing up. Make sure Lift Rod (9E) moves freely. Be sure Spout
Body (9A) is centered and facing forward and tighten the Mounting Nut (9C) until Spout
Body (9A) is firmly secured to sink.
Caution: Do not over tighten!
3
7A
7D
7D
7E
7E
7E
7G
7F
7F
7A
7B
7B
7C
7C
8A
8D
8C
8E
8A
8B
9A
9B
9C
9E
9D
Page view 2
1 2 3 4 5 6 7 8 ... 13 14

Comments to this Manuals

No comments